
Break Walls
Jet Boat John's Palace
Private Lakefront Residence
The finished build
Jet Boat John's Palace — in motion.
A short film of the completed shoreline.
The project
A failing, eroded shoreline rebuilt as an engineered poured-concrete break wall.
A failing, eroded shoreline rebuilt as an engineered poured-concrete break wall — armour-stone toe protection, a reinforced wall keyed into the lakebed, and a decorative stone-faced finish that turned a collapsing bank into a clean, hard edge and a fully usable, finished waterfront.
Scope of work
- Failed-bank excavation & shoreline demolition
- Keyed armour-stone toe protection
- Reinforced, poured-in-place concrete break wall
- Decorative stone-faced finish & waterfront restoration
On site
Jet Boat John's Palace — the build.
15 photos from the project. Click any image to enlarge.














